Crew Estimator
How many hands does today actually need? Sized from real planned labour.
Counts the work the day contains — picking trips, top-up moves, pallet moves — and divides by what one person gets through in a shift. Pickers and equipment operators are sized separately.
Daily
roster vs suggested vs staffed, recorded
2 crews
compared on the same day, same KPIs
How it works
Crew Estimator, in three moves.
Only the top-ups feeding today’s orders hold up picking, so those hands go in early; everyone else flexes as the day moves. Suggestions self-tune from recorded actuals, and the gap between roster, suggested and staffed is recorded every day — the labour half of the savings story.
01
Count
Add up the day’s real work — trips, moves, pallets — and divide by one person’s shift output.
02
Gate
Top-ups that feed today’s orders go first, so nobody waits at an empty face.
03
Flex
Beyond the dedicated top-up hand, operators switch roles as the day moves — moves, pallets, then picks.
Capabilities
- Sized from planned labour minutes — not a roster, not a rule of thumb
- Pickers and equipment operators sized separately
- Gating: order-feeding top-ups first, stock-health top-ups any time
- Flex roles: one dedicated top-up operator, the rest switch as work runs out
- Four modes: manual, suggested, confirm, compare
- Self-tuning from recorded actuals — every rate labelled with its source